| Step | Who | What happens |
|---|---|---|
| Building wiring | Provider + management | MDF & risers cabled to fibre |
| Approval | JMB / MC | Access granted for installs |
| Unit install | Technician | Last drop run into your unit |
Why does a condo need management approval for fibre?
Fibre cabling runs through shared infrastructure, the MDF/telecom room and the building risers, which are managed common property. The JMB or Management Committee must approve access before cabling work.
What does the building need for Maxis Fibre?
The building must be wired to a fibre distribution point, have working riser pathways, and grant the provider access to the MDF and floors for installation.
How can residents get fibre approved in their condo?
Residents can request it from the management office. The more residents who ask, the more likely management is to approve and providers to prioritise the building.
Can installation differ block to block in the same condo?
Yes. Larger developments are wired block by block, so one tower can be ready while another is still pending, which is why coverage is confirmed per unit.